Commercial Interior Fit-out & Build Project at Komatsu | Bukit Mertajam, Penang, Malaysia

Share:


Commercial Interior Fit-out & Build Project at Komatsu | Bukit Mertajam, Penang, Malaysia

A Completed Commercial Fit-Out, Office Renovation and Industrial Facility Improvement Project by Kitchen Story Sdn. Bhd.

Commercial and industrial renovation projects require more than interior design. They involve integrating functional workspaces, durable construction materials, building services, storage infrastructure, security systems and external facilities into a coordinated project.

Kitchen Story Sdn. Bhd., an established interior design and build company based in Penang, Malaysia, recently completed a comprehensive commercial and industrial fit-out project covering office interiors, operational facilities, building improvements and specialist installations.

From LVT office flooring and PU epoxy flooring to air-conditioning systems, CCTV, access control, industrial storage racking and washing bay works, this project demonstrates our experience coordinating diverse construction and installation activities.

The completed project reflects Kitchen Story's approach to delivering practical, organised and professionally finished spaces designed around commercial and operational requirements.

Project Overview

Project Category: Commercial & Industrial Design and Build
Location: Penang, Malaysia
Project Status: Completed
Project Contractor: Kitchen Story Sdn. Bhd.
Project Scope: Commercial Interior Fit-Out, Building Improvements, M&E Coordination, Storage Infrastructure and External Works

Comprehensive Project Scope

1. Office Interior Fit-Out and LVT Flooring

A well-designed office environment should combine professional appearance, functionality and ease of maintenance.

For this project, our office fit-out scope included:

  • Luxury Vinyl Tile (LVT) flooring installation

  • Interior partition works

  • Plaster ceiling installation

  • Painting and surface finishing

  • Aluminium and glass works

  • Electrical wiring works

  • Air-conditioning works

  • Custom cabinetry and built-in furniture

  • Meeting room and workspace arrangements

LVT flooring was selected for the office areas as part of the interior finishing works. Its suitability for commercial spaces depends on the specific product specification, wear layer, installation method and expected foot traffic.

The completed office interior provides an organised workspace with coordinated architectural finishes and building services.

2. PU Epoxy Flooring for Commercial and Industrial Areas

Commercial and industrial floors require finishes appropriate to their operational conditions.

The project included PU epoxy flooring works for designated areas, providing a flooring solution selected as part of the building's functional requirements.

Flooring system selection should consider substrate conditions, anticipated loading, surface preparation, environmental exposure and maintenance requirements.

3. Industrial Storage Racking System

Efficient storage is an important consideration in commercial and industrial facility planning.

This project included the installation of a storage racking system to organise materials and support storage operations.

Industrial racking layouts should consider accessibility, intended loading, available space, equipment movement and operational safety.

The racking system formed part of the broader facility improvement works coordinated under this project.

4. Dedicated Storage Room with IBC Tanks

A designated storage room was included in the project, incorporating Intermediate Bulk Container (IBC) tanks.

This area forms part of the facility's operational storage arrangements.

Storage rooms containing IBC tanks require appropriate consideration of tank contents, loading, accessibility, ventilation, spill containment and other applicable safety requirements.

The project scope included the relevant storage room works and coordination of the IBC tank arrangements.

5. Washing Bay and Grease Trap Installation

The project included a dedicated washing bay as part of the commercial facility improvements.

Washing bay design and installation should consider operational workflow, flooring, drainage arrangements and the types of activities undertaken within the area.

A grease trap was also installed as part of the project's drainage-related works.

The suitability of wastewater treatment and separation systems depends on the nature of the discharged water and applicable technical requirements.

6. Electrical Wiring and Air-Conditioning Works

Electrical and air-conditioning installations play an important role in the usability and operation of commercial premises.

Our project scope included:

  • Electrical wiring works

  • Air-conditioning installation and related works

  • Coordination of electrical services with interior construction

  • Integration with the relevant building and interior requirements

These works required careful coordination with ceiling construction, partitions, furniture arrangements and other installation activities.

7. CCTV Surveillance and Door Access Control

Security and controlled access were also part of the project's scope.

The project included:

  • CCTV system installation

  • Electronic door access system works

  • Coordination of security systems with building infrastructure

These installations contribute to monitoring and access management within the commercial premises, subject to the system configurations and operational requirements.

8. Aluminium, Glass and Interior Partition Works

Aluminium and glass installations were incorporated alongside partition construction to complete the required interior arrangements.

These works contributed to the separation and organisation of commercial spaces while maintaining a consistent architectural appearance.

9. Anti-Climb Fencing and Automatic Gate

External security and access infrastructure formed another important component of this project.

The scope included:

  • Anti-climb perimeter fencing

  • Automatic gate installation

  • Associated external installation coordination

These improvements were incorporated into the overall building and site works.

10. Car Park Line Marking

The project included car park line marking to define vehicle parking areas and support an organised external layout.

Appropriate car park markings help communicate parking arrangements and vehicle circulation requirements.

11. Water Filter and Water Tank Installation

Water-related infrastructure works formed part of the completed project.

These included:

  • Water filter installation

  • Water tank installation

  • Associated installation and coordination works

Water infrastructure must be planned in accordance with operational demand, equipment specifications and site conditions.

12. Painting, Exterior Signage and Final Finishing

Painting works and exterior signage installation contributed to the completed presentation of the premises.

Finishing activities were coordinated with the other construction and installation works to achieve a consistent overall appearance.

Integrating Interior Design with Industrial Facility Requirements

This project involved a combination of office improvements, industrial storage facilities, utility installations, security systems and external infrastructure.

Unlike a typical office refurbishment, a project of this nature requires coordination across several distinct work packages.

These include:

Architectural & Interior Works

  • Office interior fit-out

  • Partitions and plaster ceilings

  • LVT flooring

  • PU epoxy flooring

  • Aluminium and glass installations

  • Painting and finishing

  • Custom cabinetry and furniture

Mechanical, Electrical & Security Works

  • Electrical wiring

  • Air-conditioning

  • CCTV systems

  • Door access systems

Industrial & Operational Facilities

  • Storage racking system

  • Dedicated storage room

  • IBC tank arrangements

  • Washing bay

  • Grease trap

  • Water filtration and water tank installations

External & Security Infrastructure

  • Anti-climb fencing

  • Automatic gate

  • Car park line marking

  • Exterior signage

Coordinating these different elements requires structured scheduling, communication between contractors and careful attention to how individual installations interact.

Why Choose Kitchen Story for Commercial Design & Build Projects?

Experience Across Different Project Requirements

Kitchen Story has experience delivering interior renovation and custom cabinetry works while coordinating specialist trades for more comprehensive commercial projects.

Custom Carpentry and Cabinetry Expertise

Our background in cabinetry fabrication and installation supports practical solutions for office furniture, built-in storage and customised commercial requirements.

Coordinated Project Execution

Projects involving different construction disciplines require appropriate planning, work sequencing and coordination between specialist contractors.

Focus on Functionality and Workmanship

We prioritise practical space utilisation, suitable materials, installation details and professionally completed finishes.

Penang-Based Since 2014

Established in 2014, Kitchen Story Sdn. Bhd. serves residential and commercial interior clients in Penang, Malaysia.

Frequently Asked Questions

What is the difference between commercial fit-out and industrial facility renovation?

Commercial fit-out generally focuses on preparing interior spaces for business use, including offices, partitions, flooring, lighting and furniture.

Industrial facility renovation may involve operational areas, specialised flooring, storage systems, access infrastructure, building services and improvements to industrial premises.

Some projects, including this completed project, involve both categories.

Can a commercial design and build project include office renovation and industrial works?

Yes. Depending on the premises and project requirements, a commercial design and build project can combine office fit-out works with operational improvements such as storage facilities, industrial flooring, washing areas and building services.

Does Kitchen Story coordinate electrical, air-conditioning and security works?

Kitchen Story has completed a commercial project involving electrical wiring, air-conditioning, CCTV and electronic door access systems.

The provision of these works in future projects depends on the required scope and the involvement of appropriately qualified specialist contractors.

What types of flooring are used in commercial and industrial fit-outs?

Different areas may require different flooring systems.

LVT is commonly used in commercial interiors, while appropriately specified PU or epoxy-based flooring systems may be selected for industrial and operational spaces.

The final selection depends on intended usage, loading, substrate conditions and maintenance requirements.

Can industrial storage systems be incorporated into a commercial renovation?

Yes. Industrial storage racking, dedicated storage rooms and related infrastructure can form part of a broader commercial renovation project.

Such systems must be designed and installed according to their intended application, loading requirements and applicable safety standards.

Looking for a Commercial & Industrial Design and Build Contractor in Penang?

Whether you're planning an office renovation, commercial interior fit-out or improvements to an existing industrial facility, coordinating the right expertise is essential.

Kitchen Story Sdn. Bhd. provides interior design, custom cabinetry and fit-out solutions, supported by experience in coordinating multiple construction and specialist installation trades.

Kitchen Story Sdn. Bhd.
Interior Design & Build
Penang, Malaysia
Established 2014

Discuss Your Commercial Project With Us

Contact Kitchen Story to arrange a consultation and discuss your commercial renovation or design and build requirements.

Designed with Purpose. Built with Precision.